Sealed classical planning verification

Plan Auditor adds an LLM-free classical planning proof to non-trivial plans. The formal layer checks symbolic reachability, while the deterministic execution auditor separately proves that the concrete work was actually performed.

The normal path is now automatic deterministic formalization. Users and agents do not need to invent STRIPS facts by hand for ordinary structured plans.

Default automatic path

After requirements, coverage, dependencies, outputs, and checks are defined—but before sealing—run:

plan-auditor-formalize compile .

For a named plan:

plan-auditor-formalize compile . --plan <name>

The compiler derives a conservative formal model only from structured Plan Auditor primitives. It deliberately does not interpret arbitrary prose or ask another LLM to invent symbolic meaning.

Generated facts are limited to four classes:

formalization-source:<SHA256>
step-completed:<STEP-ID>
output-available:<STEP-ID>:<NAME-SLUG>:<HASH>
requirement-satisfied:<REQ-ID>

The source fingerprint covers the task, requirements, step coverage, dependency/output dataflow, declared outputs, and non-generated verification checks. Generated formal checks are excluded from the source projection so the fingerprint is non-circular.

Two independent generated checks

Automatic formalization installs two behavioral checks into one plan step:

  1. plan-auditor-formal verify ...
  2. verifies the embedded grounded STRIPS contract,
  3. enforces the Plan Auditor dependency DAG,
  4. checks symbolic preconditions/effects and final goals,
  5. can optionally cross-check with Fast Downward.

  6. plan-auditor-formalize verify ...

  7. recomputes the expected generated contract from the current structured plan,
  8. recomputes the source fingerprint,
  9. requires exact equality with the embedded generated contract,
  10. rejects stale, weakened, omitted, or manually edited generated formalizations.

This separation matters. A contract can be internally reachable and still be the wrong contract. The second check proves that a generated contract is exactly the deterministic compilation of the plan source rather than a weaker model proposed by the same AI.

What the compiler derives

For every plan step, the compiler creates one formal action.

The action receives:

  • the current formalization-source:<SHA256> marker as a precondition,
  • an output-available:... precondition for every requires_outputs reference,
  • a step-completed:<STEP-ID> add effect,
  • an output-available:... add effect for every declared named output,
  • a requirement-satisfied:<REQ-ID> add effect for every covered must/should requirement.

The final goal includes:

  • every required requirement-satisfied:<REQ-ID> fact,
  • every generated step-completion fact,
  • every generated output-availability fact.

The classical planner independently enforces depends_on. The generated output facts additionally bind symbolic reachability to concrete Plan Auditor dataflow.

If an explicit dependency edge is not backed by requires_outputs, automatic formalization fails instead of inventing a missing data dependency.

Requirement binding

For every must or should requirement REQ-X, the canonical formal fact is:

requirement-satisfied:REQ-X

The integrated semantic verifier rejects a plan unless:

  • the fact is a final goal,
  • it is not pre-satisfied in the initial state,
  • at least one action produces it,
  • every producer is a step whose covers contains REQ-X,
  • every formal action has a symbolic effect.

For automatically generated contracts, an additional stronger condition applies: the entire contract must exactly equal deterministic recompilation from the structured plan.

So simply changing the contract and recomputing its SHA is not enough to bypass the verifier.

Source-fingerprint chain

The trust chain for generated contracts is:

host-owned request + acceptance checks
        -> exact plan requirements
        -> covers / dependencies / outputs / requires_outputs / checks
        -> deterministic source SHA-256
        -> generated STRIPS contract
        -> independent deterministic recompilation/equality check
        -> STRIPS reachability
        -> deterministic execution evidence
        -> sealed aggregate PASS

If the structured plan changes after generation, the source SHA changes and the old generated contract becomes invalid. Re-run the compiler before sealing.

The compiler refuses to mutate a plan once its seal file exists.

Optional Fast Downward cross-check

Automatic generation can include an external Fast Downward requirement:

plan-auditor-formalize compile . \
  --fast-downward auto \
  --require-fast-downward

The generated plan-auditor-formal check then includes the external-planner requirement in its sealed argv.

PDDL export remains available:

plan-auditor-formal export-pddl . \
  --contract-sha <sha256> \
  --output ./pddl-proof

The output contains:

  • domain.pddl
  • problem.pddl
  • facts.json

Human fact strings are mapped to generated predicates before being inserted into PDDL syntax.

Internal planner behavior

The built-in planner is a grounded STRIPS-style planner.

For models with no delete effects, facts only accumulate and Plan Auditor uses a deterministic forward solver. For models with delete effects, it uses bounded state-space search.

Every action can execute at most once. A candidate action is applicable only when:

  • all Plan Auditor dependencies are complete, and
  • all symbolic preconditions are currently true.

PASS requires all plan steps to execute and all final goals to be true.

Search is fail-closed. Exceeding the configured state bound produces UNKNOWN/REVISE rather than PASS.

Modeling limits

The internal planner understands a deliberately small fragment: positive preconditions, and unconditional add/delete effects. Typed objects, numeric fluents, conditional effects and derived predicates are not modeled. A contract that needs them should not be stretched into this fragment — model it manually and review it (see below), because the planner would otherwise reason about a weaker contract than the one you believe you wrote.

For the same reason, an ordering found by the planner proves that some execution order of the declared actions reaches the goals under the declared facts. It does not prove anything about effects you did not declare.

Bounds and exit codes

The state-space bound defaults to 100000 states and can be changed per run:

plan-auditor-formal verify . --max-states 500000

The accepted range is 1..100000000. plan-auditor-formal verify exits 0 for PASS, 2 for FAIL/REJECT and 3 for UNKNOWN, so a search that hit the bound is never mistaken for a verified contract: exit 3 says "could not decide", not "the plan is wrong".

Manual domain-specific models

Manual STRIPS contracts are still supported when a project genuinely needs domain facts that cannot be derived from Plan Auditor's structured plan.

Create a manual anchor with:

plan-auditor-formal make-check formal-contract.json

The automatic compiler will not overwrite an existing manual formal contract.

This is intentional. Domain semantics such as physical states, protocol states, scientific assumptions, or business invariants should not be silently guessed from natural-language prose. They should be explicitly modeled and reviewed.

Relationship to the architecture

Modern AI / coding agent
        |
        v
Host request + acceptance checks
        |
        v
Requirements + coverage + dependency/output DAG
        |
        v
Deterministic auto-formalizer
        |
        +--> source SHA-256 provenance
        +--> requirement goals
        +--> output/dataflow facts
        +--> one action per step
        |
        v
Independent deterministic recompilation check
        |
        v
Grounded STRIPS reachability
        |
        +--> PDDL / Fast Downward (optional)
        |
        v
Soar-like lifecycle / subsumption priority
        |
        v
Deterministic subprocess/filesystem audit
        |
        v
Seal + evidence + aggregate completion gate
        |
        v
PASS / FAIL / UNKNOWN

Trust boundary

Automatic formalization closes a major trust gap: the same AI that wrote the implementation no longer needs to be trusted to invent a structurally convenient STRIPS model for ordinary plans.

It does not claim to solve arbitrary natural-language semantic formalization. The compiler only derives facts from explicit requirements, coverage, dependency/output dataflow, and checks. Host-owned request acceptance checks remain authoritative for the meaning of the user's request.

For domain semantics that cannot be derived mechanically, fail closed or use a reviewed manual formal model; do not invent facts merely to obtain a formal PASS.

The default internal planner and compiler are local, CPU-only, and require no model API, GPU, or network connection.